Adair has been preparing the kitchen floor for the new ALURE laminate floor. While Hailey finishes the grouting in the bathroom, he prepared and cleaned the floor area, after filling in any gaps in the subfloor.
The Kitchen is due to arrive on the 6th of February, along with the appliances, so we need to get the floor down, at least in the kitchen. This new laminate "tile look" floor, glues to each other, rather than the floor itself. It is a sealed joint and is waterproof, perfect for the kitchen and hallway where we are putting it down.